Tuesday, July 7, 2020

Patagonia News

Volvo Penta Powers Tour Boats in Beagle Channel

The company, Los Yámanas S.A. – who offers sea excursions in the Beagle Channel – is using Volvo Penta Inboard Performance System (IPS) to power two of their tour boats. Tours start from Ushuaia, the capital of Tierra del Fuego – an island at the southern tip of South America. It’s long been known as the southernmost city on Earth and is one of Argentina’s top destinations. Passengers can expect to have a taste of the wild, including a trip to see the penguin colony at Martillo…

Photo: Oceanco

Meet the new 105m Esquel

Oceanco’s newest project, the 105-meter (345 ft) diesel-electric driven Esquel has been conceived and designed to explore new territories.Oceanco created Esquel in collaboration with Timur Bozca Design, stylist Gina Brennan, Lateral Naval Architects and Engineering and Pelorus—an experiential and yacht expedition travel company.Sporting a displacement hull with a plumb bow, Esquel has been designed for extensive cruising to remote regions extending from the North Pole to the South Pole and everywhere in between.A blend between an expedition vessel and a superyacht…

Photo courtesy of Cummins Marine

New Catamaran “Unicat” in Argentina

In September 2018,  a 17 x 5 meter catamaran completed its final tests in the Tigre Delta of theTigre on the Parana River near Buenos Aires, Argentina prior to its delivery to her Chilean owners.The cat was designed by Eng. Emilio Noel and built by Astilleros Unidelta SA. which has a well-established reputation in a wide range of steel and aluminum workboats. The yard has a plant located in Buenos Aires with 10,000 cubic meters of open and 4,000 cu.m. of covered work space. The…

Photo: Man Diesel & Turbo

MAN GenSets for Chilean Fishing Vessel

MAN Diesel & Turbo received an order for three MAN 6L21/31 gensets to power a wellboat newbuilding for Patagonia Wellboat, the Chilean fish-farming operator. The order is the latest in a long history of wellboat references for MAN Diesel & Turbo in Chile’s domestic fish-farming industry, the company said. The new wellboat, to be built at Asenav in Valdivia, Chile, will be the first vessel in a new generation of wellboats designed and developed by Asenav in cooperation with Patagonia Wellboat. Engine delivery is scheduled for Q4 2015 with vessel delivery expected May 2016.